
… More
… More
… More
… More
This project in Maumee started with the excavation for the stamped concrete walkway from the drive around to the veranda in the backyard to the new patio with a new brick and natural stone firepit and walls to match the … More
… More
… More
This project was started in June 2015 in Sylvania Township. Kirk and his team began with the excavation into the side of a ravine to a depth of 25-30′. Slowly digging down in a stair step fashion in order to build … More
… More
Kirk Wylie Masonry started this project on the jobsite. Once the excavation was complete the footers were poured and the construction of the columns began. Constructed of core filled block with rebar reinforcement, the columns were then covered with natural stone. … More
… More